Services
Our Step by Step System

Plasticoate PUMMA system installation on a flat roof ( no extra insulation)
-
The Plasticoate roof coating is applied on the concrete or the bitumen substrate. After cleaning and opening bubbles. Make sure that there is no water and water damp in the old insulation system. If yes install channels and vents into the old roofing membrane to make sure that water damp can evaporate.
- Apply the primer Plasticoate 112 (concrete) or 116 ( asphalt) with a roller on the substrate,slightly broadcast with quarz 12-15 mesh.
-
When cured install the Plasticoate 800 PUMMA roof coating with a rubber squegee or a roller. Mix the Plasticoate 800 roof coating together with the filler pack on site and add the nesessary hardener depending on the temperature.
-
Apply the Polyester fleece into the first layer with a 3" overlap.
-
Spread out Plasticoate 800 again on top of the embedded fleece wet in wet until the surface is completely covered. Let the coating cure. ( less than 2 hours) It is possible to cover the coating with slate to protect the coating from UV and increase its lifetime.
Our Service
If You are interested in getting a quote for Your flat roof, balcony, terrasse or Your brick/tile roof, send us the details and 1-2 pictures. We will forward these infos to one of our contractors who will meet You and see the site to prepare an offer for Your job.
Our Trainings
Our products are installed by approved contractors only. If You are interested in joining a training in our facilities or even on Your jobsite please give us a call that we can arrange it.